#Project CodeProject NameDepartmentDistrictPhaseProgress StatusApprove Date
     
86941MOBEDS/3/SM/TengnopalConstruction of Sadhavna Mandav/Sadhavna Mandap at Tengnoupal TD BLockMOBCTengnoupal160
86942CT-4/NH-I/2018-19/15Rehabilitation/Reparing of damaged pavement in between Km 296.310 and Km 297.579 on NH-02(old NH-39), Mao-Imphal Section during the year 2018-19 (SH: PWDKangpokpi2018-19Completed
86943CT-4/NH-I/2018-19/16Rehabilitation/Reparing of damaged pavement in between Km 296.310 and Km 297.579 on NH-02(old NH-39), Mao-Imphal Section during the year 2018-19 (SH: PWDKangpokpi2018-19Completed
86944CT-4/NH-I/2018-19/17Rehabilitation/Reparing of damaged pavement in between Km 296.310 and Km 297.579 on NH-02(old NH-39), Mao-Imphal Section during the year 2018-19 (SH: PWDKangpokpi2018-19Completed
86945CT-4/NH-I/2018-19/17Rehabilitation/Reparing of damaged pavement in between Km 296.310 and Km 297.579 on NH-02(old NH-39), Mao-Imphal Section during the year 2018-19 (SH: PWDKangpokpi2018-19Completed
86946CT-4/NH-I/2018-19/17Rehabilitation/Reparing of damaged pavement in between Km 296.310 and Km 297.579 on NH-02(old NH-39), Mao-Imphal Section during the year 2018-19 (SH: PWDKangpokpi2018-19Completed
86947CT-4/NH-I/2018-19/17Rehabilitation/Reparing of damaged pavement in between Km 296.310 and Km 297.579 on NH-02(old NH-39), Mao-Imphal Section during the year 2018-19 (SH: PWDKangpokpi2018-19Completed
86948CT-4/NH-I/2018-19/18Rehabilitation/Reparing of damaged pavement in between Km 296.310 and Km 297.579 on NH-02(old NH-39), Mao-Imphal Section during the year 2018-19 (SH: PWDKangpokpi2018-19Completed
86949CT-4/NH-I/2018-19/18Rehabilitation/Reparing of damaged pavement in between Km 296.310 and Km 297.579 on NH-02(old NH-39), Mao-Imphal Section during the year 2018-19 (SH: PWDKangpokpi2018-19Completed
86950WRD-FCW-121Anti Erosion Scheme of Post Monsoon Work SH - Construction of CC Retaining Wall at Irong Nallah-LBB at Lamlongei, Mantripurkhri for a length of 16m.Water Resources Department (WRD)Imphal-West1Completed
86951WRD-FCW-121Anti Erosion Scheme of Post Monsoon Work SH - Construction of CC Retaining Wall at Irong Nallah-LBB at Lamlongei, Mantripurkhri for a length of 16m.Water Resources Department (WRD)Imphal-West1Complited
86952EE/CDL/Upgradation of Rd. japhou Br/RIDFUpgradation of road in and around Monsang Pantha i/c Japhou B azar road.PWDChandel50% CompletedOngoing
86953NEC-Top DusaraAugmentation of Top Dusara water supply schemePHEDImphal-EastI75
86954RAMS/EAPAcquiring and Procurement of Road Asset Inventory, Pavement Condition and Roughness Data for Subsequent development of RAMS of PWD Roads, ManipurPWDImphal-West1Ongoing
86955EE/HS/AFS/Re-constn. of Rd. from Wangoi../42.Re-constn. of Rd. from (i) Wangoi to Nambul Rver, (ii) Naorem to Nambul River & Internal roads of Govindagram, Wangoi.PWDImphal-WestPhase 1In progress
86956EE/HS/AFS/Re-constn. of Rd. from Wangoi../42.Re-constn. of Rd. from (i) Wangoi to Nambul Rver, (ii) Naorem to Nambul River & Internal roads of Govindagram, Wangoi.PWDImphal-WestPhase 1In progress
86957EE/HS/AFS/Re-constn. of Rd. from Wangoi../42.Re-constn. of Rd. from (i) Wangoi to Nambul Rver, (ii) Naorem to Nambul River & Internal roads of Govindagram, Wangoi.PWDImphal-WestPhase 1In progress
86958IED/line drain-Angom Leikai/370Constn. of line drain from RDS rotary to Angom Leikai Eastern side and AIR eastern side Ph-IIPWDImphal-EastNAIn progress
86959NESIDS THONGJUConstruction of six overhead tank and ground sump and necessary pipe lines in the Thongju and its adjoining areas in Imphal East District for promotinPHEDImphal-EastI20
86960SDF-Awang PotsangbamAugmentation of Water Supply Scheme at Awang Potsangbam KhunouPHEDImphal-EastI100%