#Project CodeProject NameDepartmentDistrictPhaseProgress StatusApprove Date
     
28781BRD/Bridge-Uchekon Kongba/26Constn. of Bridge over Kongba River at Uchekon KongbaPWDImphal-East---completed
28782EE/TBL/Darpan/Plan/178Impvt. of Khangabok Mamang road connecting NH-39 to Nungleima Lairembi Temple-4kmPWDThoubalI70%
28783SS/D-2/KabowakchingPS 5ACR-BSP Construction of Dilapidated Building Primary School under Samagra Shiksha for the year 2023-24 at Kabowakching Primary School, Bishnupur, Manipur. Education (S)BishnupurnillUnder Construction
28784BRD/Bridge-Uchekon Takhok Mapal/25Constn. of RCC Bridge Kongba River at Uchekon Takhok MapalPWDImphal-East----Completed
28785SE-I/DAR/20-21/CRIF/IE-R1.31 NH39 - IrilbungImprovement of road from NH-39 to Irilbung via Kongba IrongPWDImphal-EastNAIn progress
28786UKL/Impvt of internal road Shimtang Ukhru/105Impvt of Internal road Shimtang Ukhrul (2 km)PWDUkhrulPhase-I85%
28787EE/BPR/Impvt Kumbi Saiton roadImprovement of Kumbi Saiton RoadPWDBishnupur1work is in progress97pc
28788UKL/DAR/2023-24/3/Mathuk bridge to Lamlang Improvement of road from Mathuk bridge to Lamlang gate, Ukhrul district SH Construction of 2 RCC Slab culvertsPWDUkhrulPhase-I97%
28789UKL/DAR/2023-24/3/Mathuk bridge to Lamlang Improvement of road from Mathuk bridge to Lamlang gate, Ukhrul district SH Construction of 2 RCC Slab culvertsPWDUkhrulPhase-I97%
28790UKL/Somdal chapel crossing to RV Themthin/120Somdal Chapel crossing to RV TGhemthing are measuring about 1.2km for WBM and BlacktoppingPWDUkhrulPhase--I61.1%
28791EE/TBL/Darpan/CRIF(P)/128Improvement of Thoubal M.I road(SH-5.30km to 15.50km)PWDThoubal290%
28792CCP/impvt of Lower Kom Keirap Road/142Improvement of Lower Kom Keirap Road 1.5 KmPWDChurachandpurphase 172% progress
28793CCP/impvt of Lower Kom Keirap Road/142Improvement of Lower Kom Keirap Road 1.5 KmPWDChurachandpurphase 1 72% progress
28794CCP/impvt of Lower Kom Keirap Road/142Improvement of Lower Kom Keirap Road 1.5 KmPWDChurachandpurphase 172% progress
28795CCP/ Lower Keirap to PHSC Upper Kom Rwal /141Construction of road from Lower Keirap to PHSC at Upper Kom Keirap with retaining wall of 30 meters 1 kmPWDChurachandpurPhase 161% progress
28796CCP/ Lower Keirap to PHSC Upper Kom Rwal /141Construction of road from Lower Keirap to PHSC at Upper Kom Keirap with retaining wall of 30 meters 1 kmPWDChurachandpurPhase 161% progress
28797CCP/ Lower Keirap to PHSC Upper Kom Rwal /141Construction of road from Lower Keirap to PHSC at Upper Kom Keirap with retaining wall of 30 meters 1 kmPWDChurachandpurPhase 161% progress
28798CCP/constn of drain at Upper Kom Keirap/140Construction of drain at Upper Kom Keirap 2 KmPWDChurachandpurphase 162%
28799CCP/constn of drain at Upper Kom Keirap/140Construction of drain at Upper Kom Keirap 2 KmPWDChurachandpurPhase 162%
28800CCP/Chingei Pangyang to NH-150 via Haotak/139Impvt. of Chingei Pangyang to NH-150 via Haotak 3.7 kmPWDChurachandpurphase 162%