| 28781 | BRD/Bridge-Uchekon Kongba/26 | Constn. of Bridge over Kongba River at Uchekon Kongba | PWD | Imphal-East | --- | completed | |
| 28782 | EE/TBL/Darpan/Plan/178 | Impvt. of Khangabok Mamang road connecting NH-39 to Nungleima Lairembi Temple-4km | PWD | Thoubal | I | 70% | |
| 28783 | SS/D-2/KabowakchingPS 5ACR-BSP | Construction of Dilapidated Building Primary School under Samagra Shiksha for the year 2023-24 at Kabowakching Primary School, Bishnupur, Manipur. | Education (S) | Bishnupur | nill | Under Construction | |
| 28784 | BRD/Bridge-Uchekon Takhok Mapal/25 | Constn. of RCC Bridge Kongba River at Uchekon Takhok Mapal | PWD | Imphal-East | ---- | Completed | |
| 28785 | SE-I/DAR/20-21/CRIF/IE-R1.31 NH39 - Irilbung | Improvement of road from NH-39 to Irilbung via Kongba Irong | PWD | Imphal-East | NA | In progress | |
| 28786 | UKL/Impvt of internal road Shimtang Ukhru/105 | Impvt of Internal road Shimtang Ukhrul (2 km) | PWD | Ukhrul | Phase-I | 85% | |
| 28787 | EE/BPR/Impvt Kumbi Saiton road | Improvement of Kumbi Saiton Road | PWD | Bishnupur | 1 | work is in progress97pc | |
| 28788 | UKL/DAR/2023-24/3/Mathuk bridge to Lamlang | Improvement of road from Mathuk bridge to Lamlang gate, Ukhrul district SH Construction of 2 RCC Slab culverts | PWD | Ukhrul | Phase-I | 97% | |
| 28789 | UKL/DAR/2023-24/3/Mathuk bridge to Lamlang | Improvement of road from Mathuk bridge to Lamlang gate, Ukhrul district SH Construction of 2 RCC Slab culverts | PWD | Ukhrul | Phase-I | 97% | |
| 28790 | UKL/Somdal chapel crossing to RV Themthin/120 | Somdal Chapel crossing to RV TGhemthing are measuring about 1.2km for WBM and Blacktopping | PWD | Ukhrul | Phase--I | 61.1% | |
| 28791 | EE/TBL/Darpan/CRIF(P)/128 | Improvement of Thoubal M.I road(SH-5.30km to 15.50km) | PWD | Thoubal | 2 | 90% | |
| 28792 | CCP/impvt of Lower Kom Keirap Road/142 | Improvement of Lower Kom Keirap Road 1.5 Km | PWD | Churachandpur | phase 1 | 72% progress | |
| 28793 | CCP/impvt of Lower Kom Keirap Road/142 | Improvement of Lower Kom Keirap Road 1.5 Km | PWD | Churachandpur | phase 1 | 72% progress | |
| 28794 | CCP/impvt of Lower Kom Keirap Road/142 | Improvement of Lower Kom Keirap Road 1.5 Km | PWD | Churachandpur | phase 1 | 72% progress | |
| 28795 | CCP/ Lower Keirap to PHSC Upper Kom Rwal /141 | Construction of road from Lower Keirap to PHSC at Upper Kom Keirap with retaining wall of 30 meters 1 km | PWD | Churachandpur | Phase 1 | 61% progress | |
| 28796 | CCP/ Lower Keirap to PHSC Upper Kom Rwal /141 | Construction of road from Lower Keirap to PHSC at Upper Kom Keirap with retaining wall of 30 meters 1 km | PWD | Churachandpur | Phase 1 | 61% progress | |
| 28797 | CCP/ Lower Keirap to PHSC Upper Kom Rwal /141 | Construction of road from Lower Keirap to PHSC at Upper Kom Keirap with retaining wall of 30 meters 1 km | PWD | Churachandpur | Phase 1 | 61% progress | |
| 28798 | CCP/constn of drain at Upper Kom Keirap/140 | Construction of drain at Upper Kom Keirap 2 Km | PWD | Churachandpur | phase 1 | 62% | |
| 28799 | CCP/constn of drain at Upper Kom Keirap/140 | Construction of drain at Upper Kom Keirap 2 Km | PWD | Churachandpur | Phase 1 | 62% | |
| 28800 | CCP/Chingei Pangyang to NH-150 via Haotak/139 | Impvt. of Chingei Pangyang to NH-150 via Haotak 3.7 km | PWD | Churachandpur | phase 1 | 62% | |