2816127/8/2012/TSM(PtVII)/MQCD/Marjing Adm Bldg/10Infrastructure Development for Destination and Circuit (SH-Construction of Administrative Building,Statue,Landscaping etc. at Marjing)PWDImphal-East1Ongoing
2816227/8/2012/TSM(PtVII)/MQCD/Marjing Adm Bldg/10Infrastructure Development for Destination and Circuit (SH-Construction of Administrative Building,Statue,Landscaping etc. at Marjing)PWDImphal-East1Ongoing
2816327/8/2012/TSM(PtVII)/MQCD/Marjing Adm Bldg/10Infrastructure Development for Destination and Circuit (SH-Construction of Administrative Building,Statue,Landscaping etc. at Marjing)PWDImphal-East1Ongoing
2816427/8/2012/TSM(PtVII)/MQCD/Marjing Adm Bldg/10Infrastructure Development for Destination and Circuit (SH-Construction of Administrative Building,Statue,Landscaping etc. at Marjing)PWDImphal-East1Ongoing
2816527/8/2012/TSM(PtVII)/MQCD/Marjing Adm Bldg/10Infrastructure Development for Destination and Circuit (SH-Construction of Administrative Building,Statue,Landscaping etc. at Marjing)PWDImphal-East1Ongoing
2816627/8/2012/TSM(PtVII)/MQCD/Marjing Adm Bldg/10Infrastructure Development for Destination and Circuit (SH-Construction of Administrative Building,Statue,Landscaping etc. at Marjing)PWDImphal-East1Ongoing
2816727/8/2012/TSM(PtVII)/MQCD/Marjing Adm Bldg/10Infrastructure Development for Destination and Circuit (SH-Construction of Administrative Building,Statue,Landscaping etc. at Marjing)PWDImphal-East1Ongoing
2816827/8/2012/TSM(PtVII)/MQCD/Marjing Adm Bldg/10Infrastructure Development for Destination and Circuit (SH-Construction of Administrative Building,Statue,Landscaping etc. at Marjing)PWDImphal-East1Ongoing
28169NH-I/GOM/2017-18/01Resectioning of road side drain i/c removal of raised side berm at selected stretches between km 231.00 and km 245.00 during 2017-18PWDSenapatiCompletedCompleted
28170NH-I/GOM/2017-18/03Resectioning of road side drain i/c removal of raised side berm at selected stretches between km 214.00 and km 231.00 during 2017-18PWDSenapatiCompletedCompleted
28171NH-I/GOM/2017-18/03Resectioning of road side drain i/c removal of raised side berm at selected stretches between km 214.00 and km 231.00 during 2017-18PWDSenapatiCompletedCompleted
28172IFCD-FCW-11Renovation of Office building of Flood Control & Drainage Division No.I(A-block) and Flood Control & Drainage Division No.II(D-Block) at LamphelpatWater Resources Department (WRD)Imphal-West1st phaseOngoing
28173IFCD-FCW-11Renovation of Office building of Flood Control & Drainage Division No.I(A-block) and Flood Control & Drainage Division No.II(D-Block) at LamphelpatWater Resources Department (WRD)Imphal-West1stphaseOn going
28174IFCD-FCW-11Renovation of Office building of Flood Control & Drainage Division No.I(A-block) and Flood Control & Drainage Division No.II(D-Block) at LamphelpatWater Resources Department (WRD)Imphal-West1stphaseOn going
28175IFCD-FCW-11Renovation of Office building of Flood Control & Drainage Division No.I(A-block) and Flood Control & Drainage Division No.II(D-Block) at LamphelpatWater Resources Department (WRD)Imphal-West1stphaseOn going
28176IFCD-FCW-15Management & control of flash flood occured in 2017-18Water Resources Department (WRD)Others1Completed
28177NH-I/GOM/2017-18/09Construction of flexible retaining structure with wire crated boulder sausage at km 260.200, Mao-Imphal section on NH-39 during 2017-18PWDSenapatiCompletedCompleted
28178IFCD-FCW-15Management & control of flash flood occured in 2017-18Water Resources Department (WRD)Others1st phaseOngoing
28179IFCD-FCW-15Management & control of flash flood occured in 2017-18Water Resources Department (WRD)Others1st phaseOngoing
28180IFCD-FCW-15Management & control of flash flood occured in 2017-18Water Resources Department (WRD)OthersOneCompleted