Project Updates
Showing 27,561-27,580 of 89,656 items.
#Project CodeProject NameDepartmentDistrictPhaseProgress StatusApprove Date
     
2756127/8/2012/TSM(PtVII)/MQCD/Marjing Adm Bldg/10Infrastructure Development for Destination and Circuit (SH-Construction of Administrative Building,Statue,Landscaping etc. at Marjing)PWDImphal-East1Ongoing
2756227/8/2012/TSM(PtVII)/MQCD/Marjing Adm Bldg/10Infrastructure Development for Destination and Circuit (SH-Construction of Administrative Building,Statue,Landscaping etc. at Marjing)PWDImphal-East1Ongoing
2756327/8/2012/TSM(PtVII)/MQCD/Marjing Adm Bldg/10Infrastructure Development for Destination and Circuit (SH-Construction of Administrative Building,Statue,Landscaping etc. at Marjing)PWDImphal-East1Ongoing
2756427/8/2012/TSM(PtVII)/MQCD/Marjing Adm Bldg/10Infrastructure Development for Destination and Circuit (SH-Construction of Administrative Building,Statue,Landscaping etc. at Marjing)PWDImphal-East1Ongoing
2756527/8/2012/TSM(PtVII)/MQCD/Marjing Adm Bldg/10Infrastructure Development for Destination and Circuit (SH-Construction of Administrative Building,Statue,Landscaping etc. at Marjing)PWDImphal-East1Ongoing
2756627/8/2012/TSM(PtVII)/MQCD/Marjing Adm Bldg/10Infrastructure Development for Destination and Circuit (SH-Construction of Administrative Building,Statue,Landscaping etc. at Marjing)PWDImphal-East1Ongoing
2756727/8/2012/TSM(PtVII)/MQCD/Marjing Adm Bldg/10Infrastructure Development for Destination and Circuit (SH-Construction of Administrative Building,Statue,Landscaping etc. at Marjing)PWDImphal-East1Ongoing
27568NH-I/GOM/2017-18/01Resectioning of road side drain i/c removal of raised side berm at selected stretches between km 231.00 and km 245.00 during 2017-18PWDSenapatiCompletedCompleted
27569NH-I/GOM/2017-18/03Resectioning of road side drain i/c removal of raised side berm at selected stretches between km 214.00 and km 231.00 during 2017-18PWDSenapatiCompletedCompleted
27570NH-I/GOM/2017-18/03Resectioning of road side drain i/c removal of raised side berm at selected stretches between km 214.00 and km 231.00 during 2017-18PWDSenapatiCompletedCompleted
27571IFCD-FCW-11Renovation of Office building of Flood Control & Drainage Division No.I(A-block) and Flood Control & Drainage Division No.II(D-Block) at LamphelpatWater Resources Department (WRD)Imphal-West1st phaseOngoing
27572IFCD-FCW-11Renovation of Office building of Flood Control & Drainage Division No.I(A-block) and Flood Control & Drainage Division No.II(D-Block) at LamphelpatWater Resources Department (WRD)Imphal-West1stphaseOn going
27573IFCD-FCW-11Renovation of Office building of Flood Control & Drainage Division No.I(A-block) and Flood Control & Drainage Division No.II(D-Block) at LamphelpatWater Resources Department (WRD)Imphal-West1stphaseOn going
27574IFCD-FCW-11Renovation of Office building of Flood Control & Drainage Division No.I(A-block) and Flood Control & Drainage Division No.II(D-Block) at LamphelpatWater Resources Department (WRD)Imphal-West1stphaseOn going
27575IFCD-FCW-15Management & control of flash flood occured in 2017-18Water Resources Department (WRD)Others1Completed
27576NH-I/GOM/2017-18/09Construction of flexible retaining structure with wire crated boulder sausage at km 260.200, Mao-Imphal section on NH-39 during 2017-18PWDSenapatiCompletedCompleted
27577IFCD-FCW-15Management & control of flash flood occured in 2017-18Water Resources Department (WRD)Others1st phaseOngoing
27578IFCD-FCW-15Management & control of flash flood occured in 2017-18Water Resources Department (WRD)Others1st phaseOngoing
27579IFCD-FCW-15Management & control of flash flood occured in 2017-18Water Resources Department (WRD)OthersOneCompleted
27580MEV-18-NAugmentation of Water Supply Schemes for Thoubal (Waithoupat)PHEDThoubalPhase 1Ongoing