| 21701 | NEC(Oklong) | Composite Water Supply at Oklong | PHED | Senapati | 1 | completed | 07/03/2020 |
| 21702 | NEC(Oklong) | Composite Water Supply at Oklong | PHED | Senapati | 1 | completed | 07/03/2020 |
| 21703 | NEC(Oklong) | Composite Water Supply at Oklong | PHED | Senapati | 1 | COMPLETED | 07/03/2020 |
| 21704 | 27/8/2012/TSM(PtVII)/MQCD/Marjing Adm Bldg/10 | Infrastructure Development for Destination and Circuit (SH-Construction of Administrative Building,Statue,Landscaping etc. at Marjing) | PWD | Imphal-East | 5 | On going | 07/03/2020 |
| 21705 | MSPCLB16 | Stringing of 132 kV single circuit line (2nd circuit) on double circuit towers from Kakching to Churachandpur | POWER (MSPCL) | Kakching | COMPLETED | 100% | 07/03/2020 |
| 21706 | EE/ED-II/Mini-Sectt.-Bldg/43 | Addition & alternation of switch gear for AC, DG & solar line in the Mini-Secretariat Building at Ccpur. | PWD | Churachandpur | 1 | Completed | 06/03/2020 |
| 21707 | MSPCLB2 | INSTALLATION OF 2x12.5 MVA, 132/33 kV S/S AT THANLON WITH ASSOCIATED LINE | POWER (MSPCL) | Churachandpur | X | 100 | 06/03/2020 |
| 21708 | MSPCLC12 | Installation of 2x5 MVA 33KV S/S along with the associated 33KV line and related civil works at Wangoi under IPDS | POWER (MSPCL) | Imphal-West | Completed | 100% | 06/03/2020 |
| 21709 | MSPCLC18 | Upgradation of 33/11 kV SS at Khoupum in Noney Dist. by installing 2x2.5 MVA Transformer | POWER (MSPCL) | Noney | Abc | 100 | 06/03/2020 |
| 21710 | MSPCLC18 | Upgradation of 33/11 kV SS at Khoupum in Noney Dist. by installing 2x2.5 MVA Transformer | POWER (MSPCL) | Noney | Abc | 100% | 06/03/2020 |
| 21711 | MSPCLC15 | Construction of 33 kV DC line on steel tubular pole from 132/33 kV Sub-Station Thoubal to 33/11 kV Sub-Station Thoubal (Old) on turn key basis | POWER (MSPCL) | Thoubal | Y | 100 % | 06/03/2020 |
| 21712 | MSPCLC15 | Construction of 33 kV DC line on steel tubular pole from 132/33 kV Sub-Station Thoubal to 33/11 kV Sub-Station Thoubal (Old) on turn key basis | POWER (MSPCL) | Thoubal | Y | 100 % | 06/03/2020 |
| 21713 | MSPCLC38 | Re-stringing & strengthening of 33 kV line from Khuman Lampak to Kongba on turn-key basis | POWER (MSPCL) | Imphal-West | 1 | 100% | 06/03/2020 |
| 21714 | MSPCLB17 | Installation of 132 kV line bays for Ningthoukhong - Churachandpur line (2nd ckt). | POWER (MSPCL) | Bishnupur | Abc | 100% | 06/03/2020 |
| 21715 | MSPCLB9 | Augmentation of Jiribam 132/33 kV SS by installing 1x20 MVA transformer | POWER (MSPCL) | Jiribam | Xyz | 80% | 06/03/2020 |
| 21716 | MSPCLC37 | Re-stringing & strengthening of 33 kV line from Utlou to Mayang Imphal on turn-key basis | POWER (MSPCL) | Imphal-West | 1 | 100% | 06/03/2020 |
| 21717 | MSPCLC37 | Re-stringing & strengthening of 33 kV line from Utlou to Mayang Imphal on turn-key basis | POWER (MSPCL) | Imphal-West | 1 | 100% | 06/03/2020 |
| 21718 | IED/Thiyam Inner Raod/40 | Impvt. of Thiyamg Inner Road connecting Community Hall to left & right | PWD | Imphal-East | 1 | In progress | 06/03/2020 |
| 21719 | IED/Approach road-Kshetri Bengoon/168 | Repairing of approach Kshetri Bengoon Awang | PWD | Imphal-East | NA | Completed | 06/03/2020 |
| 21720 | BD-II/AE-I/SDC salam Keikhu | Constn. of SDC Office complex at Salam Keikhu | PWD | Imphal-West | Phase 1 | In progress | 06/03/2020 |