8041WRD-IMW-22Maintenance of Singda Dam(SH - Repairing of trough superpassage at RD 930.00 m of 20 Cusecs Canal at Singda)Water Resources Department (WRD)Kangpokpi7.992.64State Plan18/03/20202019-2020-CompletedView
8042NH-137A-19-20-01FDR on NH-137A, restoration of slided and construction of boulder sausage at km 3.6PWDKangpokpi39.680Others18/03/20202019-2020-In-ProgressView
8043NH-39-18-19-16FDR on NH-39, Construction of protection wall at km 287PWDKangpokpi13.330Others18/03/20202018-2019-In-ProgressView
8044NH-39-18-19-17FDR on NH-39, construction of breast wall km 289.59 and km 289.70PWDKangpokpi20.030.00Others18/03/20202018-2019-In-ProgressView
8045NH-137A-18-19-14FDR on 137A, construction of boulder sausages at km 2.70PWDImphal-West41.8214.64Others18/03/20202018-2019-In-ProgressView
8046EE/ED-III/LED LAMPS BLDG DIVN-I, PWD/15IMPVT. OF IEI IN THE BLDG. OF PWD COMPLEX AT KHOYATHONG WITH ENERGY SAVING LAMPS (REPLACEMENT OF LAMPS WITH LED IN THE BUILDING DIVISION NO. I)PWDImphal-West6.095.00Others17/03/20202018-2019-In-ProgressView
8047EE/ED-III/LED LAMPS ELECTRICAL CIRCLE, PWD/14IMPVT. OF IEI IN THE BLDG. OF PWD COMPLEX AT KHOYATHONG WITH ENERGY SAVING LAMPS (REPLACEMENT OF LAMPS WITH LED IN THE ELECTRICAL CIRCLE)PWDImphal-West11.684.00Others17/03/20202018-2019-In-ProgressView
8048EE/ED-III/LED LAMPS BLOCK-D PWD/13IMPVT. OF IEI IN THE BLDG. OF PWD COMPLEX AT KHOYATHONG WITH ENERGY SAVING LAMPS (REPLACEMENT OF LAMPS WITH LED IN THE BLOCK -D))PWDImphal-West10.073.00Others17/03/20202018-2019-In-ProgressView
8049EE/ED-III/LED LAMPS BLOCK-C PWD/12IMPVT. OF IEI IN THE BLDG. OF PWD COMPLEX AT KHOYATHONG WITH ENERGY SAVING LAMPS (REPLACEMENT OF LAMPS WITH LED IN THE BLOCK -C)PWDImphal-West5.744.00Others17/03/20202018-2019-In-ProgressView
8050EE/ED-III/LED LAMPS BLOCK-B PWD/11IMPVT. OF IEI IN THE BLDG. OF PWD COMPLEX AT KHOYATHONG WITH ENERGY SAVING LAMPS (REPLACEMENT OF LAMPS WITH LED IN THE BLOCK -B)PWDImphal-West17.144.00Others17/03/20202018-2019-In-ProgressView
8051EE/ED-III/LED LAMPS BLOCK-A PWD/10IMPVT. OF IEI IN THE BLDG. OF PWD COMPLEX AT KHOYATHONG WITH ENERGY SAVING LAMPS (REPLACEMENT OF LAMPS WITH LED IN THE BLOCK -A)PWDImphal-West21.970.00Others17/03/20202018-2019-In-ProgressView
8052IED/SDO-Keirao/398Constn. of SDO Keirao Bitra (SH: Constn. of SDO & SDC office and land developmentPWDImphal-East212.380.00State Plan17/03/20202018-2019-In-ProgressView
8053BD-II/AE-III/MLA Flat/2019-20Renovation of MLA Flat at Babupara.PWDImphal-East58.250.00Others17/03/20202019-2020-In-ProgressView
8054IED/Slab culvert-Line drain/397Constn. of Slab culvert 5m span RCC culvert, Chana, 5m span at Lamlai Karthong, 4m span at Lamlai Maning Leikai, 5m span at Sheijang Teramakhong .....PWDImphal-East200.00192.5State Plan16/03/20202016-2017-In-ProgressView
8055IED/Kshetrigao/Idigah/396M/o road from Kshetrigao/Idigah road to Top Western side of Iril riverPWDImphal-East19.978.00State Plan16/03/20202017-2018-In-ProgressView
805662/9/2018/SPP/DC/MANIREDA(IE)Conversion of Off grid to Grid Interactive SPV Power Plant,Imphal EastMANIREDAImphal-East82.440State Plan16/03/20202019-2020-In-ProgressView
8057TML/Eleng-Chaton/44Improvement of road from Eleng to Chaton - 7 kmPWDTamenglong29.960.00State Plan16/03/20202018-2019-In-ProgressView
8058MANIDCO_C&I_31CONSTRUCTION OF COMPOUND FENCING OF DIC/ACTC (WESTERN & SOUTHERN SIDE), POROMPAT, DIC, IMPHAL EASTTrade Commerce and IndustriesImphal-East59.970State Plan16/03/20202019-2020-In-ProgressView
8059TML/Thiulon-Vachengphai/43Impvt. of road from Thiulon to Vachengphai IVRPWDTamenglong29.980.00State Plan16/03/20202018-2019-In-ProgressView
8060TML/Old-New Lenglong/42Impvt. of road from Old Lenglong to New Lenglong IVRPWDTamenglong29.930.00State Plan16/03/20202018-2019-In-ProgressView