24.8678392,93.91900620000001
24.8642448,93.9264789
0.85324638967197
280.82
The estimate provides R.C.C. (M20) in Skeleton works - Pile foundation, Grade beam, Plinth beam, Lintel, Slab and Column pillars, Brick work (1:4) in steps, Half brick masonry (1:4) in walls, Marble stone slab flooring, 40mm C.C. flooring, Teak wood in doors, windows, ventilators, 12mm cement plaster (1:4), finished with dis tempering inside walls and cement paint outside walls.