Project Updates
Showing 21-40 of 88,146 items.
#Project CodeProject NameDepartmentDistrictPhaseProgress StatusApprove Date
     
21SE-I/IW-DRP/2022-23/R105-4 Major Khul DM CampConstn of roads, drains and culverts in Thangal Bazar, Major Khul and DM CampusPWDImphal-West-100%
22IWD/Incomplete Works/293Incomplete work of drainage system on the southern side along U.K. Road from foot to Over bridge to Canteen RoadPWDImphal-West-Completed
23IED/Top Moirangkampu-Naharup Thong/884Improvement of road from Top Moirangkampu, Top Dusara to Kshetri Bengoon Naharup ThongPWDImphal-East--Completed 26/02/2025
24IED/Porompat road No. II/902Impvt. of Porompat road No. IIPWDImphal-East--Completed 16/07/2024
25IED/Idigah Road/883Improvement of Idigah roadPWDImphal-East--Completed 26/02/2025
26IWD/KantoShantipur-cooperative/SE-I/014Impvt. of road from Kanto Shantipur to Co-operativePWDImphal-West--completed19/04/2025
27IED/Return Wall-Top Khongnangkhong Bridge/862Contn. of Return Wall at Top Khongnangkhong Bridge, Kshetrigao A/C, Imphal eastPWDImphal-East--Completed 17/07/2024
28IED/Idigah Road(Ph-2)-Kheikhu/892Improvement of Idigah Road Phase 2 in and around KeikhuPWDImphal-East--Completed 26/02/2025
29IED/Porompat Road_2-Sabal Leikai/893Improvement of Porompat road No. 2 in and around Sabal LeikaiPWDImphal-East--Completed26/02/2025
30IED/Standard College Road/882Improvement of Standard College Road.PWDImphal-East--Completed 16/07/2024
31SE-I/IW/DRP/2023-24/R1/128-18 Mayanglangjing Improvement of IVR at Mayanglangjing Taning from Mayanglangjing Bridge to Awang Leikai to Makha Leikai internal road (SH:- WBM & Premix Carpeting)PWDImphal-West--Completed26/03/2025
32IED/Pangantabi-Saugram/339Impvt. of Purum Pangantabi to Purum Saugram Nepali Ring Road (SH: SG, WBM, PC)PWDImphal-East--Completed16/07/2024
33SE-I/IW/DRP/2023-24/R1/128-18 Mayanglangjing Improvement of IVR at Mayanglangjing Taning from Mayanglangjing Bridge to Awang Leikai to Makha Leikai internal road (SH:- WBM & Premix Carpeting)PWDImphal-West--Completed17/07/2024
34IED/Porompat road No. II/902Impvt. of Porompat road No. IIPWDImphal-East--Completed
35SE-I/DRP/2023-24/Rc-98 - foothpath Dingku RdConstruction of foothpath for Dingku road, Imphal EastPWDImphal-East--completed 100 pc11/07/2024
36SE-I/DRP/2023-24/Rc-98 - foothpath Dingku RdConstruction of foothpath for Dingku road, Imphal EastPWDImphal-East--completed 100 pc11/07/2024
37IED/In&around Ningthem Pukhri-Imoinu/872Impvt. of road in and around Ningthem Pukhri Mapal in connection with Emoinu Iratpa,2023.PWDImphal-East--Completed till sdbc..drain completed
38IED/Ngathokpi Road/894Improvement of Ngathokpi Road.PWDImphal-East--completed 26/02/2025
39IED/Kongpal Iranpham-Thambalkhong/891Improvement of Road from Kongpal Iranpham Thong to Thambalkhong eastern side Kongba BazarPWDImphal-East--Completed16/07/2024
40SE-I/DRP/IE/22-23/R1.68 Phurailatpam colonyImprovement of drainage system in Phurailatpam ColonyPWDImphal-East--Completed31/07/2024